Project Manager, Eaton Power Quality Corporation
February 2002 - August 2007
Coordinated and oversaw the installation of UPS Systems at different Air Force and FAA facilities.
Hired and coordinated installation personnel such as union electrical and mechanical personnel, battery technicians, and test engineers.
Coordinated, scheduled and monitored labor hours and material costs, to stay within budget.
Project Manager, Wells Global, PLLC
April 2000 - February 2002
Coordinated and oversaw the installation of UPS Systems at different Air Force and FAA facilities.
Hired and coordinated installation personnel such as union electrical and mechanical personnel, battery technicians, and test engineers.
Scheduled and monitored labor hours and material costs, to stay within budget.
Project Manager, Powerware Corporation
December 1996 - April 2000
Coordinated and oversaw the installation of UPS Systems at different Air Force and FAA facilities.
Hired and coordinated installation personnel such as union electrical and mechanical personnel, battery technicians, and test engineers.
Coordinated, scheduled and monitored labor hours and material costs, to stay within budget.
Installation Manager, Exide Electronics
May 1994 - July 1996
Coordinated and managed the installation of a 500 Kilo-volt ampere (KVA) uninterruptible power source (UPS); associated switchgears, e.g. input, output, standby; and two 675 Kilowatt (KW) engine generators, at twenty four Air Route Traffic Control Centers (ARTCC) for the Federal Aviation Administration.
Hired and coordinated the work of over 35 employees, such as union electrical and mechanical personnel, battery technicians, and test engineers.
Scheduled and monitored labor hours and material costs, to stay within budget.
Assistant Project Manager, L.K. Comstock & Co
October 1989 - January 1993
Managed street lighting contracts within the city of New York City and Long Island.
Oversaw the estimating, that included drawing take-offs and material/labor price quoting.
Coordinated all labor installation involvement.
Electrical Design Supervisor, Comstock Engineering, Shoreham, NY & Perry, Ohio
September 1979 - March 1985
Managed design groups related to electrical equipment, conduit, and supports at the Shoreham, NY and Perry, Ohio nuclear power plants.
Coordinated and interfaced with all other trade design and installation groups.
Involved with all on-site OSHA requirements.