Employment History

Eric W. Gabriel Ed.D

Project Manager, Eaton Power Quality Corporation

February 2002 - August 2007

  • Coordinated and oversaw the installation of UPS Systems at different Air Force and FAA facilities.

  • Hired and coordinated installation personnel such as union electrical and mechanical personnel, battery technicians, and test engineers.

  • Coordinated, scheduled and monitored labor hours and material costs, to stay within budget.

Project Manager, Wells Global, PLLC

April 2000 - February 2002

  • Coordinated and oversaw the installation of UPS Systems at different Air Force and FAA facilities.

  • Hired and coordinated installation personnel such as union electrical and mechanical personnel, battery technicians, and test engineers.

  • Scheduled and monitored labor hours and material costs, to stay within budget. 

Project Manager, Powerware Corporation 

December 1996 - April 2000

  • Coordinated and oversaw the installation of UPS Systems at different Air Force and FAA facilities.

  • Hired and coordinated installation personnel such as union electrical and mechanical personnel, battery technicians, and test engineers.

  • Coordinated, scheduled and monitored labor hours and material costs, to stay within budget. 

​

Installation Manager, Exide Electronics

May 1994 - July 1996

  • Coordinated and managed the installation of a 500 Kilo-volt ampere (KVA) uninterruptible power source (UPS); associated switchgears, e.g. input, output, standby; and two 675 Kilowatt (KW) engine generators, at twenty four Air Route Traffic Control Centers (ARTCC) for the Federal Aviation Administration.

  • Hired and coordinated the work of over 35 employees, such as union electrical and mechanical personnel, battery technicians, and test engineers.

  • Scheduled and monitored labor hours and material costs, to stay within budget.

Assistant Project Manager, L.K. Comstock & Co

October 1989 - January 1993

  • Managed street lighting contracts within the city of New York City and Long Island.

  • Oversaw the estimating, that included drawing take-offs and material/labor price quoting.

  • Coordinated all labor installation involvement.

Electrical Design Supervisor, Comstock Engineering, Shoreham, NY & Perry, Ohio

September 1979 - March 1985

  • Managed design groups related to electrical equipment, conduit, and supports at the Shoreham, NY and Perry, Ohio nuclear power plants.

  • Coordinated and interfaced with all other trade design and installation groups.

  • Involved with all on-site OSHA requirements.